Florida Highway Patrol: Lift Station & Force Main (See Pictures Below)

The Lift Station and Force Main Project was a comprehensive endeavor aimed at enhancing infrastructure efficiency and reliability. Here's a detailed description of the completed project:

Project Overview: The project involved the construction and installation of a lift station and force main to facilitate the efficient transfer of wastewater within the designated area.

Erosion and Sediment Control: Robust erosion and sediment control measures were implemented throughout the project site to mitigate environmental impact and ensure regulatory compliance.

Site Clearing and Demolition: Prior to construction, meticulous site clearing and demolition activities were conducted to prepare the area for the installation of essential infrastructure components.

Grading and Excavating: Precise grading and excavating work were executed to create a suitable foundation for the lift station, force main, and associated structures.

Sanitary Sewer System: A state-of-the-art sanitary sewer system was implemented, enhancing sanitation and wastewater management capabilities in the region.

Landscape and Irrigation: In addition to infrastructure installation, landscaping and irrigation enhancements were integrated to promote environmental sustainability and aesthetic appeal in the project vicinity.

Sod Repair: Targeted sod repair activities were undertaken to address damaged areas within the project site, ensuring a seamless and uniform landscape upon completion.

Sewer Pipe Installation: Skilled technicians located and tapped into existing sewer pipes, followed by meticulous backfilling and installation of silt fences to safeguard the integrity of the sewer network.

Concrete Installation for Lift Station: Precise excavation and concrete pouring were carried out for the installation of the lift station, ensuring structural integrity and operational efficiency.

Electrical and Sewer Trenching: Trenching activities were conducted to lay electrical and sewer lines from the designated trailer area to the lift station, facilitating seamless connectivity and functionality.

Grass Seed and Hay Cover: Following construction activities, grass seed and hay cover were applied to promote vegetation growth and prevent soil erosion, contributing to the restoration of the project site.

Sod Installation and Cleanup: The final phase involved the meticulous laying of sod and thorough cleanup of the project area, ensuring a pristine and aesthetically pleasing environment for stakeholders and the community.

Overall, the Lift Station and Force Main Project exemplified a holistic approach to infrastructure development, integrating cutting-edge technology, environmental stewardship, and meticulous craftsmanship to meet the region's sanitation and wastewater management needs effectively.

Get in Touch

Interested in optimizing your underground utilities for efficiency and reliability? Reach out to us today to discuss your needs and schedule a consultation. Our experienced team specializes in underground utility services, offering expert advice, personalized solutions, and top-quality workmanship to meet your project requirements. Contact us now to explore how we can help enhance the performance and longevity of your underground utilities.

D. Armstrong Construction

Join Our Team

Explore diverse roles across the construction spectrum, from entry-level positions to seasoned professionals, tailored to your expertise and aspirations. Join an industry renowned for its unwavering stability, offering consistent employment prospects even in challenging economic climates. Access lucrative compensation packages with competitive wages and potential for additional incentives, recognizing your valuable contributions.

D. Armstrong Construction

Armstrong Contracting

D. Armstrong Contracting, LLC
9957 Moorings Drive, Suite 405
Jacksonville, Florida 32257
Office@Darmstrong.Net

(904) 351-6411

Copyright © 2025 • All Rights Reserved
Designed By Ocean Web Design